We were employed to design and build upstairs and downstairs office suites and an internal wash bay to this newly constructed unit.

Constructed metal stud partitions, suspended ceilings, bathroom block, with disabled access.  All plumbing and electrical work designed and installed by our skilled team.  Steel staircase added to provide fire escape from mezzanine level.

Our bespoke design of wash bay featured significant ground and drainage works to link into existing infrastructure.

All delivered with full building control sign-off, to budget and within three months.

1/7

AMT Vehicle Rental

© 2018 by WESTFORM. Created with Wix.com

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Google+ - Grey Circle